Turner Construction Company

CALIFORNIA STATE UNIVERSITY-RFB-FOR, CHICO BUTTE HALL DATA CTR ONLY PREQUAL PROJECT


Project Specs:

Notice ID #: 6385

Bid Date: 04/24/2020

Type Of Notice: Sub-Bid Advertisement
Location: CA: Chico

BDOQ: DVBE, SBE

Contact: See Notice Summary for details on how to respond to this notice.


Notice Summary:

Turner Construction Company

2500 Venture Oaks Way #200, Sacramento, CA 95833
• T 916.444.4421 • F 916.444.9214

California State University, Chico: Butte Hall Data Center Only Request for Subcontractor Prequalification (Including SB and DVBE)

DATE:

Friday, April 10, 2020

TO:

Solicited Subcontractor

FROM:

Turner Construction Company – Debbie DeVries

PHONE:

916-554-7930

 

PQ DUE DATE:

2500 Venture Oaks Way #200, Sacramento, CA 95833

 

PREQUALIFICATIONS ARE DUE ON OR BEFORE FRIDAY, APRIL 24, 2020 AT 2:00 PM.

E-MAIL:

ddevries@tcco.com

PREQUALIFICATION IS BASED ON A PASS/FAIL CRITERIA NOTED IN THE PREQUALIFICATION PACKAGE.


Project Description:

Project consists of relocating an existing data center currently located within Butte Hall at CSU, Chico into a new stand-alone prefabricated / modular unit. Qualified bidder will have experience with fabricating and installing modular units approximately 24-ft x 50-ft (1,200 sf) or 31-ft x 48ft (1,488 sf) in size. These sizes are not exact, but have been right sized to physically fit on the proposed location on campus and house all required equipment. Data center to include approximately a 200 sf support space and mechanical room. Within the data center qualified bidder may be asked to provide wall and overhead cable tray, equipment and cable management racks, plywood on walls, etc. Existing UPS and generator most likely will be reused. Mechanical systems (HVAC units and ductwork) and electrical infrastructure (wall outlets and sorts) to be new by the qualified bidder within the structure.
Foundation and non-standard façade systems will be by others. Most fiber and copper equipment will be existing (by owner).

 

Preliminary Project Schedule:

 

Activity

Start Date

End Date

Prequalification Period

Monday, April 13, 2020

Friday, April 24, 2020

Request for Proposal – Bid Period

Monday, April 27, 2020

Friday, May 15, 2020

Evaluate and Award Period

Monday, May 18, 2020

Friday, June 12, 2020

Design, Review, Permit, and Construction

Monday, June 15, 2020

Friday, May 7, 2021

Network Equipment Migration and Cutover

Monday, May 10, 2021

Friday, June 25, 2021

Project Complete

 

Friday, June 25, 2021

 

Prequalification:

All subcontractors must be pre-qualified to submit a Proposal. THE DUE DATE FOR PRE-QUALIFICATION SUBMITTAL IS FRIDAY, APRIL 24, 2020 BY 2:00 PM. Prequalification Applications are on-line at www.turnerconstruction.com. Questions regarding on-line  Prequalification Applications or procedures should be directed to Tiffany McAvoy @ 916-554-7955 or via e-mail at tmcavoy@tcco.com.

 

In addition to the online standard form of prequalification for Turner Construction, Turner and CSU, Chico, require the subcontractor to have experience on three similar projects of the size and type described. Contact Debbie DeVries at ddevries@tcco.com for the CSUC Supplemental Prequalification Form which will be used to identify your past experience. Please note if your firm has a completed online prequalification with Turner Construction that is less than 1 year old and financial information for 2019/2020 is uploaded to the online prequal, this should be indicated when you send in the project experience information document. If your financial information is 2018 or older, you will need to submit up to date information online.

 

Prevailing Wages:

The Contractor agrees to comply with all provisions of California Labor Code Sections 1771, 1775, 1776, 1777.5, 1813, and 1815

 

SB and DVBE:

Proposals that address SB and DVBE participation is a requirement and will be given special consideration.
SB Requirements for the Project are 6%
            DVBE Requirements for the Project are 3%

 

Bid Packages Currently Prequalifying:

 

BP #10.49

Prefabricated / Modular Construction Units Designed to House Data Centers

+/- $500K

 

Turner Construction is signatory to the Carpenters and Laborers Union.

PREQUALIFICATIONS ARE DUE ON OR BEFORE FRIDAY, APRIL 24, 2020 AT 2:00 PM


 

Please email Debbie DeVries at ddevries@tcco.com for the CSUC Supplemental Prequalification Form.

 

See Link here for Turner Construction online Prequalification Application: www.turnerconstruction.com.

 

Turner Construction Company, an equal opportunity general contractor, is accepting prequalifications for the CSU, Chico Butte Hall Data Center project located in Chico, California. MBE, WBE, DBE, SB, and DVBE firms are encouraged to participate.




----- Advertising -----










Click Here

----- Advertising -----
Click Here
Click Here

Want To Advertise On This Page? Contact Us