F.M. HASKELL CORPORATION

F.M. HASKELL CORPORATION- RFB-PROJECT NO-C20-046-FOR, COGENERATION SYSTEM INSTALLATION


Project Specs:

Notice ID #: 6605

Bid Date: 10/28/2020

Type Of Notice: Invitation to Bid
Location: CA: Concord

BDOQ: DVBE, SBE

Contact: See Notice Summary for details on how to respond to this notice.


Notice Summary:


F.M. HASKELL CORPORATION

Subcontractor and Supplier Bids Requested for Project C20-046:

Central Marin Sanitation Agency

1301 Andersen Dr., San Rafael, CA 94901

Cogeneration System Installation Project

BIDS DUE BY: Wednesday, October 28th, 2020 at 5 p.m. 

 

Please email estimating@haskellcorp.com to request an RFP letter if you’re interested in providing a quote.  You will be sent an email including a link to the bid documents, Haskell’s pre-qualification form and Haskell’s standard contract terms. DVBE participation is required for this contract. Small Business Enterprise (SBE) participation is encouraged. California prevailing wages and bonds apply.

If you need hard copies of the plans and specifications or have other inquires about the project, please call (925) 266-4086.

Fax all quotes to 925-433-9557 or email to estimating@haskellcorp.com 

The scope of work for this project is:

Construction of a new dual-fuel (biogas and natural gas) internal combustion engine cogeneration system. The work includes demolition of two existing supply fans, sky lights, and conduits; installation of one new owner-furnished cogeneration engine-generator, remote radiator, heat recovery and exhaust silencer units, two new urea totes and scale systems, static mixer, two heat recovery pumps, other ancillary equipment, and related items; procurement and installation of required piping, insulation, and instrumentation between owner-furnished equipment; procurement and installation of a hot water heat exchanger, hot water pump and associated piping to connect to the Plant’s existing Hot Water Loop; procurement and installation of bypass biogas piping and associated flow meters and valves to recirculate biogas through the existing biogas conditioning system; procurement and installation of two new supply fans and associated; replacement of portions of the existing roofing material; procurement and installation of one new programmable logic controller, owner-furnished cogeneration switchgear, owner-furnished vendor control panels, and related items; connect new heat recovery system to existing Hot Water Loop piping; connect new biogas and natural gas piping to existing systems; repair and reconstruction of existing improvements affected by the Work, and incidentals for a complete usable facility. 400 calendar days.

Haskell is requesting quotes for the following divisions:  

Division 3          –          CONCRETE

Division 5          -           METAL

Division 7          –          THERMAL AND MOISTURE PROTECTION

Division 9          –          FINISHES

Division 11        –          EQUIPMENT

Division 13        –          SPECIAL CONSTRUCTION

Division 16        –          ELECTRICAL

Division 17        –          INSTRUMENTATION AND CONTROLS

 

HASKELL CORPORATION

DBA F.M. HASKELL CORPORATION

1320 Willow Pass Rd. Suite 600 Concord, CA 94520 Lic #: 540106