Contact Us

|
   Call A Sales Rep Today!
609-336-2746 x 6138
official.bids@construction.com

Proposal & Bid Notice Details:


Fanas Architecture

BOULDER MOUNTAIN FIRE PROTECTION DISTRICT- NTC-FOR, CONST OF NEW FIRE BARN NO.2 PROJECT.


Project Specs:

Notice ID #: 6618

Bid Date: 11/16/2020

Type Of Notice: Request for Qualifications
Location: CO: Boulder


Contact: See Notice Summary for details on how to respond to this notice.


Notice Summary:

NOTICE

PRE-QUALIFICATION OF GENERAL CONTRACTORS

TO BID ON CONSTRUCTION OF NEW FIRE BARN NO. 2

 

NOTICE IS HEREBY GIVEN that Boulder Mountain Fire Protection District, a political subdivision of the State of Colorado, will be constructing a new Fire Barn No. 2 at 50 Overlook Lane, Boulder, Colorado 80304.

 

This is a public works project. The project will consist of deconstructing the existing Fire Barn No. 2 and constructing a new 8,316 square foot two story fire station utilizing a pre-designed, pre-manufactured metal skin structure. The interior will consist of two offices, a conference room, day room, dining room, kitchen, fitness room, six apparatus bays, and auxiliary spaces.  Associated site work will include excavation of existing site for below-grade improvements, domestic water, fire line, sanitary and construction of a concrete drive and parking lot.  Landscaping is part of this project.  The budget for this project is estimated in the range of $3,000,000.00.

 

The Fire District is soliciting general contractor applications for pre-qualification to bid on this project. Only general contractors that have been approved through this pre-qualification process will be eligible to bid on the project.

Beginning 8:00 a.m. (MDT) on Monday, October 26th, 2020, pre-qualification applications may be obtained from the Fire District’s architect, Fanas Architecture, 2930 Broadway, Suite 106, Boulder, CO 80304; 303.444.5380; info@fanas.us.

 

Completed and sealed pre-qualification applications must be received by the Fire District’s architect, Fanas Architecture, 2930 Broadway, Suite 106, Boulder, CO 80304; 303.444.5380; info@fanas.us, on or before 4:00 p.m. (MST) on Monday, Nov. 16th,  2020. Pre-qualification applications received after the submission deadline will not be considered.

 

Each application must conform and be responsive to the standard pre-qualification application form provided by the Fire District. Any deviation from the standard application form, or failure to provide the required information, may be considered nonresponsive and grounds for disqualification and rejection of the application. The Fire District reserves the right to reject any or all pre-qualification applications and to waive any irregularities in any responses received.

 

                                                BOULDER MOUNTAIN FIRE PROTECTION DISTRICT

 

 

                                                By: Dale Smith, Fanas Architecture

                                                On Behalf of the Boulder Mountain Fire Protection District

 

 



----- Advertising -----










Click Here

----- Advertising -----
Click Here
Click Here

Want To Advertise On This Page? Contact Us