Contact Us

|
   Call A Sales Rep Today!
609-336-2746 x 6138
official.bids@construction.com

Proposal & Bid Notice Details:


JVA Inc.

THE CITY OF OURAY-RFQ-FOR, WASTEWATER TREATMENT FACILITY EXPANSION PROJECT.


Project Specs:

Notice ID #: 6828

Bid Date: 04/29/2021

Type Of Notice: Request for Proposal
Location: CO: Glenwood Springs


Contact: See Notice Summary for details on how to respond to this notice.


Notice Summary:

NOTICE OF REQUEST FOR PROPOSALS

Date:

April 8, 2021

RE:

Wastewater Treatment Facility Expansion - Construction Manager at Risk – City of Ouray

 

Introduction/Invitation The City of Ouray is soliciting proposals for the Wastewater Treatment Facility Expansion for selection of a Construction Manager at Risk (CMAR) firm.

 

The Owner intends to contract with the selected CMAR firm to assist the Owner and

Engineer in finalizing the design and developing the construction documents.  The scope of the project includes: All necessary labor, supervision, equipment, tools, and materials for improvements of the wastewater treatment facility (WWTF), includes but is not limited to the construction of a new mechanical WWTF and decommissioning the existing lagoons. The new mechanical facility is inside a building that includes screening and vortex grit removal, a moving bed bioreactor (MBBR) secondary treatment system, dissolved air flotation (DAF) clarification, ultraviolet (UV) disinfection, a non-potable water pumping system, aerobic digestion and dewatering, and chemical addition. There will also be an operations building with offices/workspace, operations room, and an electrical room within the building. Work also includes installation of the following equipment: laser flow meter in manhole; mechanical fine screen; vortex grit removal with pump and classifier; blowers; pumps; mixers; diffused air systems; MBBR media retention screens; dissolved air flotation (DAF) tanks and thickener system; air compressors; chemical feed and storage systems; dewatering press and polymer blending system; digester mixing/aeration system; UV disinfection system; v-notch weir; and all ancillary equipment, site piping, process piping, and appurtenances. Work to include all associated site work related to the project including but not limited to grading, storm drainage, paving and seeding. In addition, work consists of installation of all electrical conduit and wiring, new electrical service, power panel, motor control centers, programmable logic controllers, and controls and integration. 

 

A non-mandatory Pre-Proposal Meeting will be held on April 14, 2021 at 1:30 PM at the

City of Ouray WWTF located at 15137 Highway 550, Ouray, CO 81427.  A site visit of the WWTF will follow the Pre-Proposal Meeting.

 

The Owner designates the following person, as its representative and Point-of-Contact for

this RFP. Respondents shall restrict all contact with the Owner and direct all questions in

writing regarding this RFP, including questions, to the Point-of-Contact person:

 

Cooper Best, P.E.

JVA, Incorporated

817 Colorado Avenue #301

Glenwood Springs, CO 81601

970-404-3003

cbest@jvajva.com

 

JVA Inc. will receive electronic proposals from qualified CMAR firms for the

Project until 2 PM on April 29, 2021. Any Proposal received after the above stated time

will not be accepted.  The District reserves the right to act in its best interest and may terminate, modify or suspend the process, reject any or all submittals, modify the terms and conditions of this selection process and/or waive informalities of any submiss



----- Advertising -----














Click Here

----- Advertising -----
Click Here
Click Here

Want To Advertise On This Page? Contact Us