Contact Us

|
   Call A Sales Rep Today!
609-336-2746 x 6138
official.bids@construction.com

Proposal & Bid Notice Details:


BUILD GROUP,INC.

BUILD GROUP,INC-RFB-MWWTP ADMIN-FOR, LAB AND DEWATERING BLDG HVAC IMP PROJECT.


Project Specs:

Notice ID #: 6853

Bid Date: 05/12/2021

Type Of Notice: Sub-Bid Advertisement
Location: CA: San Francisco

BDOQ: DVBE, MBE, WBE, SBE

Contact: See Notice Summary for details on how to respond to this notice.


Notice Summary:

Build Group, Inc. is requesting subcontractor bids from all Certified / Qualified MBE/ WBE /SBE/DVBE  subcontractors’ and material suppliers for the following project:

 

This is a Prevailing Wage project

 

MWWTP Admin, Lab and Dewatering Buildings HVAC Improvements

Owner: EBMUD – East Bay Municipal Utilities District

Location: 2020 Wake Avenue Oakland, CA 94607

Bid Date & Time: 5/12/21 1:30PM

 

Scope of Work: Work for this Project will occur at the following four buildings located at the MWWTP: Administration Building, Laboratory Building, Dewatering Building, and Thickening Building. The Administration Building and Laboratory Building are adjoining structures and have a common HVAC system and will therefore be treated as a single building. Similarly, the Dewatering and Thickening Building are adjoining and share HVAC equipment and will therefore be treated as a single building and referred to as just “The Dewatering Building.” Work includes the following: Administration/Laboratory Building - Select demolition and replacement of existing 200 ton air cooled chiller, recirculation pumps, expansion tank and associated chilled water piping; select demolition of existing process chiller and replacement with 5 ton air cooled chiller; select demolition and replacement of 1,000 CFM exhaust fan and 1,000 CFM fumehood exhaust fan; demolition of existing built up roof and replacement with modified bitumen roof; installation of fall protection railing around perimeter of building roof; select demolition and replacement of chilled water pipe insulation within building’s above ceiling space; installation of pipe supports on roof for future pipe; furnishing of temporary chiller to maintain building operation during construction; handling and proper disposal of debris and hazardous waste; and all required testing and training. Dewatering Building - Select demolition and replacement of 45,000 CFM roof mounted vane axial exhaust fan; select demolition and replacement of 47,30 CFM roof mounted vane axial exhaust fan; select demolition and replacement of 40,000 CFM supply fan located in building mechanical room; modification of fiberglass and sheet metal ductwork; installation of exhaust dampers on supply and exhaust grilles; installation of split system; rebalancing of building ventilation system; handling and proper disposal of debris and hazardous waste; and all required testing and training.


Estimate: $4,900,000

Email: estimatingpw@buildgc.com

Fax: 415-366-1883

Contact: David Kramer at 650-421-5359 if you have any questions

 

Access to plans and specs are available by request.

 

Please email ALL bids and questions to estimatingpw@buildgc.com

 

Build Group, Inc.

160 S. Van Ness Avenue, San Francisco, CA 94103

 

 



----- Advertising -----














Click Here

----- Advertising -----
Click Here
Click Here

Want To Advertise On This Page? Contact Us