Contact Us

|
   Call A Sales Rep Today!
609-336-2746 x 6138
official.bids@construction.com

Proposal & Bid Notice Details:


Jviation, a Woolpert Company

CITY OF LAMAR-ITB-AIP PROJECT NO-3-08-0036-023-2021-FOR, SE CRA IMP PROJECT


Project Specs:

Notice ID #: 6892

Bid Date: 06/15/2021

Type Of Notice: Invitation to Bid
Location: CO: Lamar

BDOQ: DBE

Contact: See Notice Summary for details on how to respond to this notice.


Notice Summary:

INVITATION FOR BIDS

 

Southeast Colorado Regional Airport

Lamar, CO

AIP Project No. 3-08-0036-023-2021


Sealed bids, subject to the conditions contained herein, for improvements to the Southeast Colorado Regional Airport, Lamar, CO, AIP Project No. 3-08-0036-023-2021 will be received by the Southeast Colorado Regional Airport, City Administration Office, Lamar, CO, 8105210/4/2120, until Tuesday, June 15, 2021, at 5:00 P.M., and then publicly opened and read aloud.

 

The work involved will include the following:

 

Schedule I - Reconstruct Taxiway A (from Apron to STA 1+50)

Schedule II - Reconstruct Taxiway A (from STA 1+50 to 2+50)

Schedule III - Reconstruct Taxiway A (from STA 2+50 3+50)

 

The approximate quantities of major bid items involved in the proposed work are:


 

 

Quantities

Item No.

Description

Units

Sch. I

Sch. II

Sch. III

C-100a

Contractor Quality Control Program (CQCP)

LS

1

1

1

C-102a

Temporary Air and Water Pollution, Soil Erosion, and Siltation Control

LS

1

1

1

C-105a

Mobilization

LS

1

1

1

P-101a

Cold Milling (Full Depth)

SY

1,760

430

420

P-101b

Removal of Pipe and Other Buried Structures

LS

0

1

0

P-152a

Unclassified Excavation (Overexcavation and Replacement)

CY

130

40

40

P-152b

Unclassified Excavation

CY

1,300

350

340

P-154a

Subbase Course

CY

650

180

170

P-154b

Separation Geotextile

SY

1,860

500

480

P-209a

Crushed Aggregate Base Course

CY

320

90

80

P-501a

Concrete Pavement

SY

1,720

450

430

P-620a

Surface Preparation

LS

1

1

1

P-620b

Marking

SF

970

250

250

P-620c

Reflective Media

LS

1

1

1

P-620d

Temporary Runway and Taxiway Marking

SF

970

250

250

D-701a

Install Reinforced Concrete Pipe

LF

0

110

0

D-701b

Install Reinforced Concrete Pipe FES

EA

0

2

0

T-901a

Seeding

AC

0.50

0.25

0.25

T-905a

Topsoil

CY

200

100

100

L-108a

Install #8 AWG, L-824C, 5000V, Wire

LF

800

0

0

L-108b

Install #6 AWG, Bare Copper Counterpoise Including Ground Rods and Terminations

LF

425

0

0

L-110a

Install 1-2" SCH. 40 PVC Conduit (DEB)

LF

425

0

0

L-125a

Remove Taxiway Edge Light and Base, Complete

EA

11

0

0

L-125b

Reinstall L-861T Taxiway Edge Light on New Light Base, Complete

EA

9

0

0

L-125c

Remove L-858 Guidance Sign, Complete

EA

2

0

0

L-125d

Install L-858 Guidance Sign, Complete

EA

2

0

0

 

Construction for this project is expected to take 57 calendar day(s).

 

Contract Documents.  The complete set of Specifications and Contract Documents can be downloaded from Jviation, Inc.’s bid site (http://bid.jviation.com), beginning on May 17, 2021.  In order to submit a responsive bid as a Prime Contractor and to receive all necessary addendum(s) for this project, you must be on the Planholder’s List.  To view all planholder documents (contract documents, plans and addendums) you must fill out the online form located at (https://www.jviation.com/bid-request/). By filling out and submitting this form, you agree to be publicly listed on the bid site with your contact information as a planholder for all projects requested. It is the planholder’s responsibility to review the site for addendums and changes before submitting their proposal. This includes review for environmental changes. Environmental changes during construction could take up to four weeks for approval. For additional information, please contact us via email at bidinfo@jviation.com.


*Note that contractors will NOT be automatically added to new projects. You will need to re-submit the online form for access to new projects. Once granted access, additional projects will use your same login credentials.  Note: Plan ahead when submitting the online request form and allow up to 2 business days for approval and access to projects.

 

Pre-Bid Conference.  The pre-bid conference for this project will be held on June 1, 2021 at 2:00 P.M., in the Second Floor Conference Room at the City of Lamar, 102 East Parmenter.  All bidders are required to examine the site to become familiar with all site conditions prior to submitting their bid.

 

Bid Conditions.  The bidder is required to provide all information as required within the Contract Documents.  The bidder is required to bid on all items of every schedule or as otherwise detailed in the Instructions to Bidders.

 

Bids may be held by City of Lamar for a period not to exceed 90 calendar days from the date of the bid opening for the purpose of evaluating bids prior to award of contract.

 

The right is reserved, as City of Lamar may require, to reject any and all bids and to waive any informality in the bids received.

 

All questions regarding the bid are to be directed to Seth Kurtz with Jviation, A Woolpert Company, 720 South Colorado Boulevard, Suite 1200-S, Glendale, Colorado 80246, (303) 524-3030, Fax: (303) 524-3031, or email seth.kurtz@woolpert.com.


Bid Bond.  Guarantee will be required with each bid as a certified check on a solvent bank or a Bid Bond in the amount of five (5) % of the total amount of the bid, made payable to the City of Lamar.


Performance & Payment Bond. The successful bidder will be required to furnish separate performance and payment bonds each in an amount equal to 100% of the contract price.


Airport and Airway Improvement Act of 1982 as Amended.  In accordance with the Davis-Bacon Act, as amended, the Contractor will be required to comply with the wage and labor requirements and to pay minimum wages in accordance with the schedule of wage rates established by the United States Department of Labor.

 

Equal Employment Opportunity and Affirmative Action Requirement.  The proposed contract is under and subject to 41 CFR Part 60-4 and Executive Order 11246 of September 24, 1965, as amended, and to the equal opportunity clause and the Standard Federal Equal Employment Opportunity Construction Contract specifications including the goals and timetables for minority and female participation. 

 

Title VI Solicitation Notice:  The City of Lamar, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 USC §§ 2000d to 2000d-4) and the Regulations, hereby notifies all bidders or offerors that it will affirmatively ensure that any contract entered into pursuant to this advertisement, will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award.



DBE Requirement. 

 

Information submitted as a matter of bidder responsibility:

The Owner’s award of this contract is conditioned upon Bidder or Offeror satisfying the good faith effort requirements of 49 CFR §26.53.

The successful Bidder or Offeror must provide written confirmation of participation from each of the DBE firms the Bidder or Offeror lists in its commitment within five days after bid opening.

1)      The names and addresses of Disadvantaged Business Enterprise (DBE) firms that will participate in the contract;

2)      A description of the work that each DBE firm will perform;

3)      The dollar amount of the participation of each DBE firm listed under (1)

4)      Written statement from Bidder or Offeror that attests their commitment to use the DBE firm(s) listed under (1) to meet the Owner’s project goal; and

5)      If Bidder or Offeror cannot meet the advertised project DBE goal, evidence of good faith efforts undertaken by the Bidder or Offeror as described in appendix A to 49 CFR part 26.

The bidder shall make good faith efforts, as defined in Appendix A of 49 CFR Part 26, Regulations of the Office of the Secretary of Transportation, to subcontract 2.40 % of the dollar value of the prime contract to small business concerns owned and controlled by socially and economically disadvantaged individuals (DBE).  In the event that the bidder for this solicitation qualifies as a DBE, the contract goal shall be deemed to have been met.  Individuals who are rebuttably presumed to be socially and economically disadvantaged include, women, Black Americans, Hispanic Americans, Native Americans, Asian-Pacific Americans, and Asian-Indian Americans.  The apparent successful bidder will be required to submit information concerning the DBE's that will participate in this contract.  The informa­tion will include the name and address of each DBE, a description of the work to be performed by each named firm, and the dollar value of the contract.  If the bidder fails to achieve the contract goal stated herein, it will be required to provide documentation demonstrating that it made good faith efforts in attempting to do so.  A bid that fails to meet these requirements will be considered non-responsive.  Those firms currently certified as DBE's by the CO Department of Transportation are eligible to participate as DBE's on this contract.  A list of these firms can be obtained from the State, the consulting engineer, or the Sponsor. 

 

Buy American Preference

The Contractor agrees to comply with 49 USC § 50101, which provides that Federal funds may not be obligated unless all steel and manufactured goods used in AIP funded projects are produced in the United States, unless the Federal Aviation Administration has issued a waiver for the product; the product is listed as an Excepted Article, Material Or Supply in Federal Acquisition Regulation subpart 25.108; or is included in the FAA Nationwide Buy American Waivers Issued list.

 

A bidder or offeror must complete and submit the Buy America certification included herein with their bid or offer. The Owner will reject as nonresponsive any bid or offer that does not include a completed Certificate of Buy American Compliance. 

 

Certification of Offeror/Bidder Regarding Debarment

By submitting a bid/proposal under this solicitation, the bidder or offeror certifies that neither it nor its principals are presently debarred or suspended by any Federal department or agency from participation in this transaction.

 

Other Federal Provisions Award of contract is also subject to the following Federal Provisions:

  • Trade Restriction Certification
  • Lobbying Federal Employees
  • Recovered Materials
  • Government-wide Requirements for Drug-free Workplace
  • Other Federal Provisions included in Part A of the Special Provisions

 

 

                                                                                    City of Lamar

                                                                                    Lamar, CO

 



----- Advertising -----














Click Here

----- Advertising -----
Click Here
Click Here

Want To Advertise On This Page? Contact Us