Contact Us

|
   Call A Sales Rep Today!
609-336-2746 x 6138
official.bids@construction.com

Proposal & Bid Notice Details:


SKANSKA TRAYLOR PNB JOINT VENTURE

SKANSKA TRAYLOR PNB JOINT VENTURE-RFP-FOR, PORTAL NORTH BRIDGE PROJECT


Project Specs:

Notice ID #: 6915

Bid Date: 07/22/2021

Type Of Notice: Request for Proposal
Location: NJ: Hackensack

BDOQ: DBE

Contact: See Notice Summary for details on how to respond to this notice.


Notice Summary:

Skanska Traylor PNB Joint Venture is soliciting cost proposals from NJ State certified DBE subcontractors/vendors for the Portal North Bridge Project which bids on

July 22, 2021.

Description of Project:

NJ TRANSIT, with the assistance of Amtrak, will construct, operate, and maintain a new Portal North Bridge and 2.44 miles of related railroad infrastructure. The project will address critical issues that have long plagued the Portal Bridge and provide the following benefits to the busiest section of railroad in North America by:

1. Eliminating the moveable span;

2. Improving reliability;

3. Increasing train speeds; and

4. Removing conflicts with maritime traffic.

 

The Project - a two-track replacement bridge – Portal North – will replace the existing, century-old Portal Bridge, with a modern, high-level fixed span that does not open or close, eliminating the movable components and risk of malfunction. The new bridge will rise more than 50-feet over the river and, including the approaches, will span nearly 2.5 miles of the Northeast Corridor.

 

Many DBE bidding opportunities available:

Portable Toilets, Cleaning, Survey, Trailers, Construction Materials & Supplies - PPE, Small Tools, Lumber, Traffic Control, Geotextile, Hazardous and Non-Hazardous Material, Soil Testing & Sampling, Testing, Treatment and Disposal of Contaminated Water, Prefabricated Vertical Drains, Demolition, Clearing and Grubbing , Steel Sheeting, Cofferdams, Marine Work, Soil Erosion and Sediment Control, Gabion Walls, Excavation, Filling, Compacting and Grading, Trucking, Containers & Dumpsters, Haul & Dispose, Jacking, Instrumentation and Monitoring, Steel H-Piles, Steel Pipe Piles, Directional Drilling, Drilled Shaft Foundations, Micropiles, Vibration Monitoring, Trackwork, Utilities (Water/Telephone/Storm/Electric), Aerial Structures Drainage System, Asphalt Paving, Concrete Paving, Site Improvements, Security Fence, Chain Link Fence, Modular Unit Walls, Asbestos Abatement, Beam Guide Rail, Lead Paint Management, Traffic Signs, Pavement Stripes and Markings, Landscaping, Topsoiling, Fertilizing and Seeding, Concrete & Rebar, Cellular Concrete Fill, Concrete Repairs, Steel -  Fabricate/Furnish/Install Strip Seal Expansion Joint Assembly, Elastomeric Bearings, Disc Bearings, Metal Fabrications, Metal Stairs, Cable Railing System, Handrails, Steel Grating, Timber Decking, Composite Decking, Bridge Fender System, Fiberglass Reinforced Polymer Walkway, Waterproofing Systems, Painting of Structural Steel, Bridge Traveler Platforms, Standpipe System, Electrical (Conduits/ Ductbanks/ Switchgear/ Transformers/ Bridge and Fender Lighting System/ Cathodic Protection/ Traction Power Identification/ Overhead Transmission System Installation/ Transmission Monopole Structures/ Fire Detection and Suppression/ Signal Power Distribution System).

 

If you are interested in bidding on this project, please contact Skanska’s Outreach Coordinator: Rosemary.Nagle@skanska.com
* EOE/M/F/Vet/Disabled



----- Advertising -----














Click Here

----- Advertising -----
Click Here
Click Here

Want To Advertise On This Page? Contact Us