Contact Us

|
   Call A Sales Rep Today!
609-336-2746 x 6138
official.bids@construction.com

Proposal & Bid Notice Details:


FINE LINE CONSTRUCTION

FINE LINE CONSTRUCTION-ITB-FOR, HOTEL DIVA,440 GEARY ST PROJECT S.F. CA


Project Specs:

Notice ID #: 7039

Bid Date: 09/15/2021

Type Of Notice: Invitation to Bid
Location: CA: San Francisco

BDOQ: MBE, WBE

Contact: See Notice Summary for details on how to respond to this notice.


Notice Summary:

FINE LINE CONSTRUCTION
D.F.P.F. Corporation,dba Fine Line Construction Lic #451707
15 Brush Place, SAB FRANCISCO,CA 94103
Telephone: 415/ 512-7677
Fax: 415/ 512-7688

INVITATION TO BID - WE ARE REQUESTING QUOTES FROM  SUBCONTRACTORS/SUPPLIERS FOR THE FOLLOWING PROJECT:

Project:                          Hotel Diva, 440 Geary St, San Francisco, CA

Bid Date/Time:                 Wednesday, September 15, 2021 @ 3:00 PM

BID WALK:                        No job-walk for this project.

RFI Deadline:                    Provide RFIs by September 10, 2021 @ 3:00 PM. (Email to:
                                      jgaloyan@finelineconst.com   


                                       ***Any RFI responses received will be uploaded into the dropbox

 

Project Description: This project is to rehabilitate the existing 7-story tourist hotel building w/ partial basement for use as congregate supportive dwelling units over ground floor street frontage commercial space. 127 existing residential units will remain and be rehabilitated with 3 being converted for use as onsite management office space. The residential unit scope of work is limited to floor and wall finishes refresh and upgrade of 7 units for full accessibility. Limited life safety upgrades will also be implemented the existing ground floor coffeehouse and full-service restaurant spaces flanking the existing lobby are to remain, while the rear part of the ground floor will be rehabilitated for resident communal meeting space and building management offices. Voluntary seismic structural upgrades are limited to diaphragm upgrades at each of the upper residential floor levels and roof. The soft story upgrade at the ground floor level will require installation of a steel frame behind the existing modern storefront. All proposed work is interior only, with no work on the historic building exterior, except for maintenance of the roof.  This is a phased project and is to be bid as such. 

 

        PREVAILING WAGE RATES                         CERTIFIED PAYROLL                        FIRST SOURCE HIRING                     

 

 Plans, Schedule, RFI responses and other relevant information for bid can be found in the dropbox link:   https://www.dropbox.com/sh/n9l6wbbyh1ionkt/AABljlNwR05IQ8yPoMzht5iPa?dl=0

 

Bids are to be clear, alternates are to be priced separately, and clarifications and or exclusions are to be included in on your scope letter.

 

Trades Needed (but not limited to): DEMOLITION, CONCRETE, SHOTCRETE, STRUCTURAL STEEL, METALS, ROUGH AND FINISH CARPENTRY, APPLIANCES, COUNTERTOPS, CABINETS, INSULATION / THERMAL AND MOISTURE PROTECTION, OPENINGS; FINISHES, ROOFING, FIRESTOPPING, DOORS, FRAMES, WINDOWS, GYPSUM / PLASTER BOARD, CEILING, FLOORING, PAINTING, VAPOR SYSTEM, SIGNAGE, SPECIALTIES, PEST MANAGEMENT, CASEWORKS, FIRE ALARM, FIRE SPRINKLERS, PLUMBING, HVAC, ELECTRICAL, LOW VOLTAGE , ERRCS SYSTEM, SECURITY SYSTEM. 

 

This invitation to bid is not intended to be inclusive of all the bidding requirements.  Please review the plans for the complete bidding documents that we have at this time.



Please SEND BIDS TO (415) 512-7688 no later than 3:00 pm ON OR BEFORE THE DATE OF BID

OR EMAIL TO JGALOYAN@FINELINECONST.COM


COMPANY NAME:____________________________________________________________________________

Please reply to fax # (415) 512-7688

 

o  YES, we are interested in bidding this job.          o  NO, we will not bid this job.

 

**Bidder Payment and Performance may be required of selected subcontractors.  Please provide bonding rate on scope letters**

  

Fine Line Construction is a signatory to the Carpenter’s and Laborer’s Collective Bargaining Agreements.  Successful Subcontractor(s) will be expected to execute a standard Fine Line Construction Subcontract Agreement.

**Certified MBE & WBE subcontractors/suppliers are encouraged to submit quotes, please include your certification number**
WE ARE AN EQUAL OPPORTUNITY EMPLOYER




----- Advertising -----
Click Here
Click Here

Want To Advertise On This Page? Contact Us