Contact Us

|
   Call A Sales Rep Today!
609-336-2746 x 6138
official.bids@construction.com

Proposal & Bid Notice Details:


INLAND PIPE REHABILITATION

INLAND PIPE REHABILITATION-ITB-CONTRACT NO-21169-FOR SXO CONSENT DECREE BIRD RIVER AND BENGIES SEWERSHED REHAB PROJECT.


Project Specs:

Notice ID #: 7397

Bid Date: 04/28/2022

Type Of Notice: Invitation to Bid
Location: MD: Baltimore

BDOQ: MBE, WBE

Contact: See Notice Summary for details on how to respond to this notice.


Notice Summary:


INLAND PIPE REHABILITATION

IPR Northeast – ITB: M/WBE Certified Firms

 

Project: SX0 Consent Decree Bird River and Bengies Sewershed Rehabilitation |
Contract No. 21169 | Job Order No. 231-201-0077-7265

Project Location: Baltimore County

Bid Due Date: 4/28/2022

Quotes Returned: 4/25/2022

 

Scopes:

  • Pre CIPP CCTV & Cleaning , Sanitary Sewer Epoxy Lining – 15 VF
    • 8" CIPP           22490         LF
    • 10" CIPP               570         LF
    • 12" CIPP               995         LF
    • 15" CIPP               325         LF
    • 18" CIPP               205         LF
    • 24" CIPP               2225       LF
    • 36" CIPP               1125       LF
    • 42" CIPP               745         LF
    • Supplemental Heavy Cleaning
    • Final Acceptance CCTV Inspection
    • Open Cut Utility Repairs
      • 8” Point Repairs
      • Test Pit Excavation
      • Stabilized Construction Entrance Install
      • Vacatee cleanout Install
      • Open excavation Cleanout Install
      • Replacement of Sewer House Connection & Lateral
      • Replace manhole Frame & Cover
      • Install new 48” Manhole
      • Placing Salvaged Topsoil 4” Depth
      • Access Rd – Mulch
      • Access Rd – Wood Mats
      • Remove & Replace curb & Gutter
      • Landscaping
        • Trees Cal. CG or B&B       15           EA
        • Shrubs 3' HT , CG              13           EA
        • Seed Mix 1 & Mulch        733         SY
        • Seed Mix 2 & Mulch        276         SY
        • Seed Mix 3 & Mulch        701         SY
        • Lateral Rehabilitation
          • 8” CIPP Spot Repairs
          • 12” CIPP Spot Repairs
          • Full Circumferential SHC Seals – 109 EA
          • Manhole Rehabilitation
            • Cementitious  Lining  - 1,300 VF
              • Strong Seal System, Permacast Process or Approved Equal
  • Erosion Control
    • Silt fence installation & Maintenance
    • Storm Drain Inlet Protection
    • Traffic Control
      • Turnkey Single lane closure with Flaggers , 12 HR Day

 

 

Specs/Plans /Questions– Ashden Middlebrooks | amiddlebrooks@teamipr.com | 470-503-5624



----- Advertising -----
Click Here
Click Here

Want To Advertise On This Page? Contact Us