
Skanska ECCO III HPA 3 Joint Venture is soliciting cost proposals from New York DBE subcontractors/vendors for the D900055 - Hunts Point Interstate Access Improvement Project Contract 3 project which bids on
July 12, 2022.
Description of Project:
The Project involves Design-Build services for the final phase of Hunts Point Access Project to provide improved access between the Hunts Point Peninsula and Sheridan Boulevard and the Bruckner Expressway for automobiles and trucks traveling to and from the commercial business located on the peninsula. This phase will include reconstruction of the at grade and elevated roadways for Bruckner Expressway, Bruckner Boulevard, and Sheridan Boulevard from phase 2 at Baretto Street north to Phase 1 at the previously reconstructed Sheridan Boulevard.
Bidding opportunities:
Asphalt Paving, Concrete Base Pavement, Trucking, Fills, Hauling and Disposal, Containers, Landscaping, Structural Concrete, Ready-Mix Concrete Supply, Concrete Reinforcement, Utilities, Structural Steel Supply and Erection, MPT, Electrical, ITS, R
oadway Lighting, Signs and Guardrail, Sign Structures, Deep Foundations (Pile/Micropiles, etc.), Line Striping, Curb and Sidewalks, Sawcutting, Sawcut Grooving, Bridge Demolition, Pavement Demolition, Support of Excavation, Precast Barrier, Cast in Place Barrier, Bridge Bearings, Bridge Expansion Joints, Fence, Concrete Retaining Walls, Asphalt Milling, Trailers, Cleaning, Furniture, Computer Services, Hazardous Material Remediation (Asbestos, Lead, etc.), Concrete Sealing, Contaminated Soil Disposal, Environmental Testing, Vibration Monitoring, Settlement Monitoring, Survey, Photography, Rodent Control, Security, BIM Modeling, Painting, Waterproofing, Structural Steel Repairs, Crack and Spall Repairs, Bird Deterrent System, Noise Barriers, Ornamental Fence, Utilities, Watermain, Drainage, Downspouts
If you are interested in bidding on this project, please contact Skanska’s Outreach Coordinator: Julia.Omanoff@skanska.com
* EOE/M/F/Vet/Disabled
