Contact Us

|
   Call A Sales Rep Today!
609-336-2746 x 6138
official.bids@construction.com

Proposal & Bid Notice Details:


J.F. SHEA CONSTRUCTION

J.F. SHEA CONSTRUCTION- RFB-SPEC NO-669-FOR, PIPELINE 5 RELNING N. TWIN OAKS VALLEY RD TO CROSSOVER PIPELINE TURNOUT PROJECT.


Project Specs:

Notice ID #: 7522

Bid Date: 06/28/2022

Type Of Notice: Sub-Bid Advertisement
Location: CA: Walnut

BDOQ: DVBE, MBE, WBE, SBE

Contact: See Notice Summary for details on how to respond to this notice.


Notice Summary:

Sub-Bids Requested from qualified MBE/WBE/SBE/DVBE Subcontractors and Suppliers for:

 

PIPELINE 5 RELINING, NORTH TWIN OAKS VALLEY ROAD TO CROSSOVER PIPELINE TURNOUT, SPECIFICATION 669

 

Owner: San Diego County Water Authority

Location: San Marcos, CA

 

Bid Date: June 28, 2022 @ 2:00 P.M.


667 Brea Canyon Road, Suite 30, Walnut, CA  91789

Phone: (909) 595-4397, Fax: (909) 444-4268

Contact: Lori Olivas, lori.olivas@jfshea.com

 

J.F. Shea Construction, Inc. is soliciting your participation in the preparation of this bid. We are particularly interested in bids from subcontractors/suppliers for the following work items:

SWPPP, Dewatering, Lead & Asbestos Abatement, Fencing, Hydroseeding/Revegitation, Aggregate Base, Grouting, Ready-Mix Concrete, Reinforcing Steel, Structural Steel, Miscellaneous Metals, Painting & Coatings, Cathodic Protection.

Plans and Specifications: Contract Documents can be downloaded via The Network or Ebidboard through the Water Authority's Contracting Opportunities page at http://www.sdcwa.org/contracting-opportunities. Plans may also be viewed at our Walnut Office. J.F. Shea Construction, Inc. is an equal opportunity employer and intends to negotiate in good faith with interested MBE/WBE/SBE/DVBE firms and intends to utilize the lowest responsive bidder. J.F. Shea expects potential subcontractors to be bondable. J.F. Shea will pay for up to 1% for subcontractor bond costs. Subcontractors and Suppliers are expected to bid per plans and specifications, including requirements for warranties. Standard manufacturer’s warranties, if not in conformance with owner’s specifications, will not be accepted.



----- Advertising -----
Click Here
Click Here

Want To Advertise On This Page? Contact Us