Contact Us

|
   Call A Sales Rep Today!
609-336-2746 x 6138
official.bids@construction.com

Proposal & Bid Notice Details:


KIEWIT SHEA TRAYLOR JOINT VENTURE

KIEWIT SHEA TRAYLOR JOINT VENTURE(KSTJV)-RFQ-FOR, VTA'S BART SILICON VALLEY PHASE II ECT-TUNNEL & TRACKWORK PROJECT (CP2)-DESIGN AND PROFESSIONAL SRVCS.


Project Specs:

Notice ID #: 7581

Bid Date: 07/20/2022

Type Of Notice: Request for Qualifications
Location: CA: San Jose

BDOQ: DVBE, DBE, SBE

Contact: See Notice Summary for details on how to respond to this notice.


Notice Summary:

REQUEST FOR DESIGN/PROFESSIONAL SERVICES SUBCONSULTANT QUALIFICATIONS

VTA’s BART Silicon Valley Phase II Extension – Tunnel & Trackwork Project (CP2): Design & Professional Services

Kiewit Shea Traylor Joint Venture (KSTJV)

Design/Professional Services Qualifications Due: July 20, 2022, 4pm PDT

KSTJV has been selected to deliver progressive design build services for VTA’s BART Silicon Valley Phase II Extension – Tunnel & Trackwork Project (CP2). At this time, the awarded contract is limited to CP2 Phase 1 services, including an innovations study, initial design, programming services, and limited early works.

KSTJV is currently soliciting Qualifications from interested Disadvantaged Business Enterprise (DBE) and Small Business Enterprise (SBE) firms whose experience and capabilities align with Phase 1 opportunities within, but not limited to the following disciplines:

• Administrative Support • Architecture – Building Design • Building Demolition Support • Commercial Photography Services • Dewatering Engineering • Drainage Design Support • Environmental Engineering • Environmental Testing Laboratories or Services • General Civil Design Services • Instrumentation and Monitoring • Interface Staff Augmentation • Landscape Architecture • MEP Design Support (Pump Design) • Peer Review (Structural, Tunnel, Seismic) • Preconstruction Survey & Property Protection Survey • Roadway Civil Design Support • Staff Augmentation for BIM / CAD Support • Structural Design Support • Subsurface Utility Engineering • Surveys – Site Design • Traffic Control Planning (MOT) • Traffic Engineering Consulting • Tunnel Design • Utilities Relocation Engineering / Support

Please note: At this early stage of the project, we are seeking firms interested in the listed CP2 Phase 1 services only (major construction award is expected in 18-24 months, during Phase 2 of the Project.


Firms certified as DBE by the California Unified Certification Program (CUCP), or SBE by VTA or the California Department of General Services are welcomed and encouraged to submit qualifications.

For detailed instructions on accessing scope documents and the subconsultant qualifications submittal process, visit: https://buildbsv2withkstjv.com/contract-opportunities/

Questions? Email: KSTJV@Kiewit.com

KSTJV Is an Equal Opportunity Employer.



----- Advertising -----
Click Here
Click Here

Want To Advertise On This Page? Contact Us