MIDWAY CITY SANITARY DISTRICT

MIDWAY CITY SANITARY DISTRICT-ITB-PROJECT NO-202041a-FOR, NEW SOLAR CARPORT AND ARRAY- PROJECT.


Project Specs:

Notice ID #: 7593

Bid Date: 07/26/2022

Type Of Notice: Invitation to Bid
Location: CA: Westminster


Contact: See Notice Summary for details on how to respond to this notice.


Notice Summary:

MIDWAY CITY SANITARY DISTRICT

 Notice is hereby given that sealed bids will be received at MIDWAY CITY SANITARY DISTRICT Office, 14451 Cedarwood Avenue, Westminster, California 92683 until 2:00PM, Tuesday, July 26, 2022. Bids will be publicly opened and read aloud at the District Conference Room for the construction of the work, entitled:  

 

New Solar Carport and Array for the Midway City Sanitary District Office

14451 Cedarwood Avenue

Westminster, California 92683

 

PROJECT #202041a: Midway City Sanitary District Solar Carport

 

1.  General Work Description:  

 

·         New 20’ x 214’ carport structure to support a solar array

·         New solar panels to be mounted on the carport structure to annually produce 140MWh.

·         All equipment required to connect solar array to existing switchgear, including wiring, inverters and all necessary equipment to send power to the existing electrical system.

·         Wiring from the carport array to the existing switchgear.  NOTE: underground conduit will be provided by Owner from the east end of the carport to the switchgear. 

·         4 new EV Charging stations and power feed for 4 future EV Charging Stations.

·         Demolition for canopy foundations, patch, repair, slurry and restripe parking area under canopy. 

·         Plan submittal and Permits from the City of Westminster, SCE, and Net Energy Metering Interconnection Request for the proposed carport and/or array.  Notifications to be sent to the District and Contractor/Installer.    NOTE: Planning Department has the installation of a carport and array, Building permits by Contractor.  Submit plans to MCSD prior to City submittal for approval.

·         Construction on-site mobilization for the canopy will not commence until the current underground construction is completed (estimated 9/15/2022).   The District will remain in operation during the construction.

 

The preliminary construction cost engineer’s estimate $325,000.

 

2.  Contract Time.  Time of completion for the Project shall be one hundred (100) calendar days established from the Notice to Proceed.

 

3. Contractor's License Requirement. Pursuant to Public Contract Code section 3300 and Business & Professions Code section 7030.5, the Contractor must possess a valid Class B Contractor's License at the time of the bid opening and specify its license number.

 

4. Payment of General Prevailing Rate Requirement. The Project is subject to compliance monitoring and enforcement by the Department of Industrial Relations (DIR).

 

5. Securing Bid Documents. Plans and specifications are available online at the MCSD website:  

 

https://www.midwaycitysanitarydistrict.com/bids-and-rfps-3b7fc14

 

6. Optional Pre-Bid Meeting and Walk Through. An optional pre-bid meeting and walk through of the site will be held on Tuesday, July 12, 2022 at 11:00am.  Meet at the Midway City Sanitary District (14451 Cedarwood Avenue, Westminster) for the purpose of reviewing bid requirements, receiving bidder questions and reviewing the site. 

 

7.  Project Workforce Agreement.  Midway City Sanitary District has entered into a “Project Workforce Agreement” with the Los Angeles/Orange Counties Building and Construction Trades Council applicable to this Project, which is included within the Instructions to Bidders. 



Dated July 1, 2022 at Westminster, California.

MIDWAY CITY SANITARY DISTRICT

By Ken Robbins, MCSD General Manager