
Pacific States Environmental Contractors, Inc. is preparing a bid as a Prime Contractor for the project listed below:
PROJECT: Chaboya Yard Phase III Well & Trench Decommissioning
IFB No. C23127F
DBE Goal Assigned is 4%
OWNER: Santa Clara Valley Transportation Authority
BID DATE: October 2, 2022, by 3PM ESTIMATOR: Christopher Pieri
PSEC is soliciting quotations from Disadvantaged Business Enterprises for the following types of work and supplies/materials including but not limited to:
Well Decommissioning Pipe & Trench Grouting Confirmation Soil Borings Minor Concrete Pavement Markings
Plans and specifications may be reviewed at our office located at 11555 Dublin Boulevard, Dublin, CA, or an electronic version is free, transferred via file transfer protocol (FTP) Site. The Project Documents may be obtained through VTA’s procurement website at https://secure.procurenow.com/portal/vta
PSEC is willing to breakout any portion of work to encourage DBE participation and solicit their subcontractor or materials and/or suppliers and trucking quotation as well as increase the expectations of meeting DBE Goal. If you require any assistance, please contact the Estimator, Christopher Pieri email him at cpieri@pacificstates.net or call (925) 803-4333
Fax your bid to (925) 803-4334 to the attention of Estimator Christopher Pieri. If you have questions for the Estimator, call at (925) 803-4333. When submitting any public works bid, please include your DUNS number and DIR number. For questions regarding registration for DIR use the link at: www.dir.ca.gov/Public-Works/PublicWorks.html
If you need DBE support services and assistance in obtaining bonding, lines of credit, insurance, necessary equipment, materials and/or supplies or related assistance or services, for this project call the Estimator at (925) 803-4333 or contact your local Small Business Development Center Network (http://californiasbdc.org) or contact the California Southwest Transportation Resource Center (www.transportation.gov/osdbu/SBTRCs). PSEC is willing to breakout portions of work to increase the expectation of meeting the DBE goal.
At our discretion, 100% Payment and 100% Performance bonds may be required as a subcontract condition. This will be a PREVAILING WAGE JOB. PSEC is an equal opportunity employer.
Thank you, Kayla Crawford
Contract Administrator