Contact Us

|
   Call A Sales Rep Today!
609-256-6896
official.bids@construction.com

Proposal & Bid Notice Details:


RINCON DEL DIABLO MUNICIPAL WATER DISTRICT

RINCON DEL DIABLO MUNICIPAL WATER DISTRICT-RFP-CM & OBSERVATION S.S-FOR, BEETHOVEN (52140) AND N.IRIS (52141) RECYCLED WATER BOOSTER PUMP STA REHAB PROJECT.


Project Specs:

Notice ID #: 8518

Bid Date: 01/25/2024

Type Of Notice: Request for Proposal
Location: CA: Escondido

Valuation($): 234000


Contact: See Notice Summary for details on how to respond to this notice.


Notice Summary:



RINCON DEL DIABLO MUNICIPAL WATER DISTRICT– Construction Management and Observation Support Services for Beethoven (52140) and N. Iris (52141) Recycled Water Booster Pump Stations Rehabilitation

Rincon del Diablo Municipal Water District (“RDDMWD”) is requesting proposals (“Proposals”) from qualified consultants (“Respondents”) for:

CONSTRUCTION MANAGEMENT AND OBSERVATION SERVICES FOR BEETHOVEN (52140) AND N. IRIS (52141) RECYCLED WATER BOOSTER PUMP STATIONS REHABILITATION

The purpose of the Proposal is to demonstrate the qualifications, competence and capacity of Respondent to perform the work or provide the services described in this RFP. The Proposal should demonstrate the qualifications of the Respondent and of the particular staff to be assigned to this project.

Consultant will be expected to provide construction management and observation services as the Owner’s representative to ensure the work is performed as designed, within budget, and within schedule.  The work will include providing and managing construction, and materials testing sub-contracts as needed.  The work will include coordinating the work with the existing RDDMWD operations and providing field inspection and public outreach for the construction contract. Resident Engineering services will be required for submittals review, pay requests, quality control, and general Construction Management services to support the construction efforts.  Construction Observation services will be required during all field activities to assure quality control, document work, and provide direct interaction with the construction Contractor. Consultant will be expected to maintain the construction records and transmit them in an orderly fashion to RDDMWD at the conclusion of the work.

A detailed Request for Proposals can be found on the District's website at https://rinconwater.org/rfp-opportunities/. While the full scope of work shall be negotiated in a Professional Services Agreement, the Respondent will be expected to fulfill, at a minimum, the services and technical requirements described in the Scope of Services.

This project focuses on two of the District’s existing Recycled Water Booster Pump Stations (RWBPS) that receive and distribute recycled water as part of this system: the Beethoven RWBPS and the North Iris RWBPS. The Beethoven RWBPS serves the Sonata Homeowner’s Association (HOA) and boosts pressures to serve a higher elevation portion of the District’s ID-A service area.  The North Iris RWBPS serves the Escondido View HOA within the District’s ID-1 service area. Both of these pump stations are over 20 years old, and a majority of the assets are either at, or near, the end of their useful life.

MANDATORY Pre-Proposal Meeting (Virtual Teams): January 11,2024 at 10:00 AM 
Mandatory Pre-Proposal Meeting.

 

Proposal DUE DATE:  January 25, 2024 at 10:00 AM to engineering@rinconwater.org

 

Contact: Shawnele Morelos with any questions related to this posting. smorelos@rinconwater.org 



----- Advertising -----

Want To Advertise On This Page? Contact Us