Contact Us

|
   Call A Sales Rep Today!
609-256-6896
official.bids@construction.com

Proposal & Bid Notice Details:


SAN FRANCISCO UNIFIED SCHOOL DISTRICT

SAN FRANCISCO UNIFIED SCHOOL DISTRICT-AFB-PROJECT NO:12384-SFUSD-FOR, ABRAHAM LINCOLN HIGH SCHOOL GENERATOR & ELECTRICAL IT UPGRADE - (REBID) PROJECT.


Project Specs:

Notice ID #: 9426

Bid Date: 02/11/2025

Type Of Notice: Invitation to Bid
Location: CA: San Francisco

Valuation($): $840,000.00


Contact: See Notice Summary for details on how to respond to this notice.


Notice Summary:



ADVERTISEMENT CALLING FOR BIDS

San Francisco Unified School District

ABRAHAM LINCOLN HIGH SCHOOL

GENERATOR & ELECTRICAL IT UPGRADE - REBID

PROJECT NO: 12384

BIDS MUST BE RECEIVED BEFORE 2:00 P.M. LOCAL TIME ON FEBRUARY 11, 2025

 

Second Floor – Room 209 - 135 Van Ness Avenue, San Francisco, CA

TIMELY BIDS WILL BE OPENED AT 2:00 P.M. LOCAL TIME

 

Contractor’s License Required for the Work: Class B, General Contractor with Asbestos and Lead Certification or Sub-Contractors with Asbestos and Lead Certification performing the work. Any Bidder not so duly and properly licensed shall be subject to all penalties imposed by law.

 

The Project is generally described as including but not limited to: Generator and Electrical IT Upgrade includes, but is not limited to, expanding the existing MDF into the adjacent room; upgrading HVAC system; new network racks and ladder system; grounding busbar system for new and existing equipment; electrical outlets; a reinforced concrete pad to support a generator system; a new natural gas generator, generator controller, and generator enclosure; network equipment for the generator; a transfer switch and generator-associated electrical panel; new outlets connected to the generator electrical panel per the design plans; fiber optic cables from MDF to a location inside the new generator enclosure; and electrical connections to new and existing electrical panels. The new system will meet all District Design Standards and Guidelines and Department of Technology Standards. All construction shall occur after school hours and on weekends during the academic year. No system outage shall occur during school hours. A dual system will function until the cutover to the new system is completed.

 

 

The estimated construction is $840,000.00

 

Prevailing Wage:         The work described is pursuant to California Labor Codes 1770 and 1771.

Job-Walks.                   No mandatory job walk is required for this project.

 

Contract advertisement is posted on the District website at:

archive.sfusd.edu/en/doing-business-with-sfusd/current-invitations-for-bids.html

 

BID AND CONTRACT DOCUMENTS AVAILABLE on January 15, 2025 at: 12:00 P.M.

ARC Northern California - Bid Services, 100 Hooper Street, Suite #20

SAN FRANCISCO, CALIFORNIA 94107 Tel: (415)537-2235 Fax: (415)348-0684 Email: sf@e-arc.com.

The Bid and Contract Documents are available at the location stated above during standard working hours (8:00AM-4:30PM) for a non-refundable payment of Fifty Dollars ($50) per set. Checks are to be made payable ARC NORTHERN CALIFORNIA. Bidder responsible for all shipping and handling fees. Plans are available for viewing at https://order.e-arc.com/arcEOC/PWELL_Main.asp?mem=23

 

Plan Holders Lists. Plan Holders lists for this project will be available at ARC - Northern California. Contact information for ARC is listed above.




----- Advertising -----

Want To Advertise On This Page? Contact Us