Contact Us

|
   Call A Sales Rep Today!
609-256-6896
official.bids@construction.com

Proposal & Bid Notice Details:


SAN FRANCISCO UNIFIED SCHOOL DISTRICT

SAN FRANCISCO UNIFIED SCHOOL DISTRICT-AFB-SFUSD-PROJECT NO-12382-SFUSD-FOR, PA SYSTEM UPGRADE PKG 4 AT VARIOUS MS.


Project Specs:

Notice ID #: 9491

Bid Date: 03/04/2025

Type Of Notice: Invitation to Bid
Location: CA: San Francisco

Valuation($): $5,900,000.00


Contact: See Notice Summary for details on how to respond to this notice.


Notice Summary:



ADVERTISEMENT CALLING FOR BIDS

San Francisco Unified School District

 

Project No: 12382 - PA System Upgrades Package 4

Aptos, Bessie Carmichael, Everett, Francisco, Presidio, Rooftop Mayeda, and Roosevelt Middle Schools

 

BIDS MUST BE RECEIVED BEFORE 2:00 P.M. LOCAL TIME ON MARCH 4TH, 2025

 

135 Van Ness Avenue, Second Floor, Room 209, San Francisco, CA

TIMELY BIDS WILL BE OPENED AT 2:00 P.M. LOCAL TIME

Contractor’s License Required for the Work: Class B, General Contractor with Asbestos and Lead Certification or Sub-Contractor with Asbestos and Lead Certification performing the work. Data cabling, fiber, and low-voltage system work must be performed by C-7 licensed contractor. Conduit and electrical work to be performed by C-10 licensed contractor. Any Bidder not so duly and properly licensed shall be subject to all penalties imposed by law.

 

The Project is generally described as including but not limited to:

Public Address System Upgrades including associated cabling, integrated clock-bell devices, wall speakers, exterior speakers and head-end equipment at the following campuses:

  • Aptos Middle School - 105 Aptos Ave, San Francisco, CA 94127
  • Bessie Carmichael Middle School - 824 Harrison St, San Francisco, CA 94107
  • Everett Middle School - 450 Church St, San Francisco, CA 94114
  • Francisco Middle School - 2190 Powell St, San Francisco, CA 94133
  • Presidio Middle School – 450 30th Ave, San Francisco, CA 94121
  • Rooftop Mayeda Middle School – 500 Corbett Ave, San Francisco, CA 94114
  • Roosevelt Middle School - 460 Arguello Blvd, San Francisco, CA 94118

Project Labor Agreement:  All Bidders are hereby notified that the District has a Project Labor Agreement (PLA) in effect on the Project and all contractors and subcontractors bidding this project will be required to comply with the PLA.

The estimated construction is $5,900,000.00

Prevailing Wage: The work described is pursuant to California Labor Codes 1770 and 1771.

 

Contract advertisement is posted on the District website at:

https://www.sfusd.edu/business-with-sfusd/current-invitations-bids

 

BID AND CONTRACT DOCUMENTS AVAILABLE on FEBRUARY 4TH, 2025, 12:00 P.M.

ARC Northern California - Bid Services, 100 Hooper Street, Suite #20

SAN FRANCISCO, CALIFORNIA 94107 Tel: (415)537-2235 Fax: (415)348-0684 Email: sf@e-arc.com.

 

The Bid and Contract Documents are available at the location stated above during standard working hours (8:00AM-4:30PM) for a non-refundable payment of One Hundred Dollars ($100) per set. Checks are to be made payable ARC NORTHERN CALIFORNIA. Bidder responsible for all shipping and handling fees. Plans are available for viewing at https://order.e-arc.com/arcEOC/PWELL_Main.asp?mem=23

 

Pre-Qualification: All Bidders are hereby notified that this Project is subject to the District’s Pre-Qualification Procedure, as defined in Section 00 01 16. The list of Pre-Qualified General Contractors is posted on the PQBids and SFUSD websites at:  

 

https://www.sfusd.edu/business-with-sfusd/prequalified-general-contractors-and-subcontractors

 

Contractors shall prequalify through PQ Bids at the link below:

 

https://go.pqbids.com/enroll-us

 

Plan Holders Lists. Plan Holders lists for this project will be available at ARC - Northern California. Contact information for ARC is listed above.



----- Advertising -----

Want To Advertise On This Page? Contact Us